The hydraulic installati on consist a central power-pack with two adjustable
axial piston pumps each driven by a 22 Kw electric motor.
The power-pack is
capable to provide the whole system with a continuous pressure of 250 Bar.
During design works of their power-packs, extra attention is paid by Hycos
to the filtration system. As a result the highest cleaning rates according ISO
are achieved.
The advanced dredge operating panel, is based on Windows 2000
PC operating system and consist of a conventional operating panel and a 15”TFT
Touch screen.
A well organised menu offers several additional operating and
control features at the operators convenience.
The applied Master / Slave
system reduced the use of electrical conventional wiring and cables on board
significantly. Signals from trailing suction pipe position, sand-pump, valve
positions and hydraulic valves are transferred as data between their positions
and the PC / PLC control-panel